The pitch · 90 seconds

From 4 sqm to a year of food.

Scroll. We will walk you through every number behind a Pasisera greenhouse — yield, water, energy, autonomy and payback — using a real Bucharest site.

Scroll to begin
scene 02 / 08
The problem

A field tomato uses 214 litres of water per kilo.

Open-field agriculture wastes water, energy and land to deliver one tomato. A closed loop greenhouse changes the unit economics of food.

Open field · per kg tomato
  • Water214 L
  • Land0.8 m²
  • Transport320 km avg
  • SeasonMay → Sep
scene 03 / 08
0kg
Tomato yield per 4 m² Pasisera bed, per year
Water used−86%

vs. open field, closed irrigation loop

Growing days312 / yr

Smart climate stretches the season

Crop rotations4.2

Auto-replanting on harvest

scene 04 / 08
Three tiers

Buy the shell. Subscribe the brain.

One-time

Core

€4,800
  • Glass + steel shell
  • Water piping pre-installed
  • Sensor / power conduits
  • Ready for upgrade
+ Core

Smart

€39/mo
  • Solar + battery bank
  • CV camera + pest detect
  • Autonomous watering
  • Climate suggestions
2026

Autonomous

Waitlist
  • Robot seeding arm
  • Harvest manipulator
  • Closed nutrient loop
  • Yield API
scene 05 / 08
Resources

4.1 kWh per kilo, all from the roof.

Tier 2 ships with a 2.4 kWp solar canopy and a 5 kWh LiFePO₄ bank. At 44° latitude that covers 94% of annual draw — pumps, fans, sensors, LED supplement and the on-board edge compute.

Solar coverage94%
Water recirculated86%
Heat retention vs. field71%
Pest events caught early92%
scene 06 / 08
Autonomy

7 minutes of attention per week.

Real telemetry from the Bucharest pilot. Tier 2 makes the watering, climate and pest decisions. You approve the weekly plan from your phone.

Decisions / week
412
Autonomous
Owner inputs
7 min
Approve / override
Sensor reads
86,400
Every minute, 60 sensors
Camera frames
14,400
CV pest scan
scene 07 / 08
0 months
Payback on Core + Smart, at retail produce prices in Bucharest
Year 1
€1,420
Year 2
€2,890
Year 3
€4,510
Year 4
€6,180
Year 5
€7,910
scene 08 / 08
Funded build · Bucharest cohort 2026

Your turn to grow.

We are taking 24 sites for the 2026 Bucharest cohort. Site assessment is free and runs on the same Solar tool you already saw.